RESUME PROJECT JAMBI COAL
1. Name of Company : PT. BCS
Mine Site : Desa Sei Beringin
Jl. Lintas Sumatera Muara Bungo-Bangko Km.26
Kabupaten bungo
Provinsi jambi
Activity : Beringin Coal Mine
2. ROUTE SITE LOCATION :
• From Jambi, sultan Thaha airport : Site-Jambi +/- 290 Km
Overland 4 Hours
• From Padang, Ketaping Airport : Site-Padang +/- 310 Km
Overland 5 hours
3. CONTACT / COMPANY AUTHORIZED
• PT. KARNA MINERALS, ENERGY RESOURCES
P : 021 71614105
M :081315399411
e-mail :
[email protected]
4. CONCESSION LICENSES
Exploration Mining
Concession In The Name Of Total Area
Number DU 1…/Jambi/1993
Number DU 1…/Jambi/1993
Number DU 1…/Jambi/1993 PT. SAP
PT. SAP
PT. SAP 2.000 Ha
2.000 Ha
2.000 Ha
Total 6.000 Ha
Exploitation Mining
Concession In The Name Of Total Area
Number….K/24.03/MPE/1998 PT. SAP 2.513 Ha
Sales Transportation
License In The Name Of
Number 000.K/25.04/MPE/1998 PT. SAP
5. EXPLORATION & EXPLOITATION
380 Ha = In this area has done all of exploration activities, includinglandcompensation. At the time has minded up to 40 Ha
2.133 Ha = Geological mapping, test pit and general survey has been done and at this area still need exploration.
6. COAL RESERVE
Prospective
Area Coal Reserve
Tons
Criteria
thickness
380 Ha 4.400.000 Proven,
Inferred,
Indicated 1-6,1 m
2.133 Ha >15.900.000 Geological 1-6,1 m
Total
2.513 Ha >20.300.000 Proven,
Inferred,
Indicated,
Geological 1-6,1 m
7. COAL QUALITY
Parameter Range Quality
As Received
Total moisture – TM (%)
Air Dry Basis
Inherrent moisture – IM (%)
Volatile Matter – VM (%)
Fixed Carbon –FC (%)
Ash Content – Ash (%)
Sulfur – S (%)
Calorific Value – CV (Kcal/kg)
10 – 18,95
6,05 – 9,98
28,60 – 44,0
28,00 – 39,83
13,00 – 19,73
0,41 – 0,83
5.000 – 6.200
COAL QUALITY ON AREA 2.133 Ha
Based on out crop and channel sampling of preliminary exploration activity, coal quality in this area is expected to be better, caused by intrusion process.
8. MINE OPERATION
1998 – 2000 Self mine
2001 – 2002 Self mine and contractor
9. INFRASTRUCTURE
In the mine site has been prepared
• Main road 10 km, mine road 3,5 km.
• Office building 460 m2
• Base camp and canteen 800 m2